28 Production
Loading Jobs
After the Load command is started, the Load dialog box opens. From this dialog
box, you can load jobs into the database for the Maxsys/MX Series modules. You
can also load Syntera jobs and CardSystem Manager (CSM) jobs. These
procedures are provided below.
Loading Maxsys/MX Series Jobs
Perform the following procedure to load job files into the database.
1. In the
Production window (Applications | Production), click the Load
button on the upper status bar. The Maxsys/MX6000 tab is displayed on the
dialog box by default.
The program allows you to pool jobs. You can select multiple job files that are
loaded contiguously. When this is done, the load status identifies the job that
is loading and its percentage complete. For example, if you load three jobs
you will see the job load progress bar go from 0% to 100% three times. If you
want to know the job that’s currently loading, hover the cursor over the
progress bar and you will see the job name in the tooltip. (This feature is not
supported for Syntera jobs.)
All selected input files must be able to use the same Job Setup.